Case studies

The best way to demonstrate technical judgment is to show how real problems were solved.

These projects show real installations, support, and commissioning work at institutions and businesses where things needed to be solved properly, documented, and left fully working.

Technical installation at height inside a school gymnasium.

Crisol Neighborhood, Córdoba Capital

Camera Installation in a School Gymnasium

Challenge: The school needed to reinforce security coverage in its gymnasium with a reliable installation, properly executed at height.

Solution: We installed a camera in the gymnasium, handling the mounting, cabling, and commissioning within the school environment.

Outcome: The institution gained visibility and security in a key space, with an installation adapted to the real conditions of the site.

Rack installation with patch panels and structured cabling for a school.

School in Cosquín

Rack Assembly & Cabling for a School Network

Challenge: The school needed to centralize connections, organize its cabling, and distribute connectivity to Wi-Fi access points and end devices.

Solution: We installed a rack with patch panels and cabling, physically organizing the infrastructure to improve network distribution and maintenance.

Outcome: The installation became far more organized, scalable, and ready to support connectivity across the entire institution.

Workstation for technical coordination of a live broadcast on Zoom and YouTube.

Córdoba Capital

Technical Coordination for Live Broadcasts During the Pandemic

Challenge: During the pandemic, several institutions and organizations needed to hold meetings and events via livestream with no room for technical failure.

Solution: We coordinated the technical operation using Zoom and YouTube, handling monitoring, broadcasting, and real-time follow-up of the stream.

Outcome: The events ran without interruption, with concrete technical support and a much more organized operation throughout the broadcast.

Screen and projector installed and running during the project carried out in Formosa. Second view of the installed screen, powered on during commissioning in Formosa. See another view
Real on-site proof Working demo video

Formosa, project coordinated from Buenos Aires

Installation of Interactive Whiteboards & Projectors

Challenge: A company in Buenos Aires that had sold the equipment to Los Salesianos in Formosa needed a team with real experience handling, installing, and commissioning delicate technology on-site.

Solution: We installed interactive whiteboards and projectors, handling mounting, wiring, configuration, and testing to leave the system running correctly inside the classroom.

Outcome: The institution was equipped for classes and presentations with interactive technology, and the project was carried out with solid technical backing thanks to prior experience installing and configuring this type of equipment.

Technology infrastructure installed in a bar, with an LED screen and segmented connectivity. UniFi access point installed in the bar area. See another view

Güemes area, Córdoba

Network Segmentation & Operational Technology for a Bar

Challenge: The bar needed to properly separate its internal operations from customer access, without mixing the point-of-sale system, the waitstaff's Postnet terminals, and management use on a single network.

Solution: We installed a MikroTik router and a UniFi access point to split connectivity into three independent networks: one for the bar's point-of-sale and payment terminals, another for customers, and a third for management. We also set up a giant LED screen and a fingerprint-based time-tracking system for staff.

Outcome: The business ended up with far more organized, secure infrastructure, clear traffic separation, better operational control, and supporting technology ready for daily use.